# Add queue

**URL:** <https://forum.yarbo.com/t/add-queue/1552>\
**Category:** Suggestion and Feature Requests\
**Created:** [May 5, 2025, 6:39pm UTC](https://forum.yarbo.com/t/add-queue/1552 "2025-05-05T18:39:27Z")\
**Posts on this page:** 1\
**Showing post:** 5

<div class="post-metadata">

**Author:** ![Ken](https://yyz1.discourse-cdn.com/flex007/user_avatar/forum.yarbo.com/ken/32/1001_2.png) [@Ken](https://forum.yarbo.com/u/Ken)\
**Post date:** [June 28, 2025, 4:22pm UTC](https://forum.yarbo.com/t/add-queue/1552/5 "2025-06-28T16:22:55Z")

</div>

> [@The Meta Work Plan: The Work Plan of Work Plans](https://forum.yarbo.com/t/the-meta-work-plan-the-work-plan-of-work-plans/1853):
>
> Ability to create a Work Plan of Work Plans, a Meta Work Plan comprising a list of existing Work Plans that you can add, remove, enable/disable, and reorder. The Meta Work Plan would behave like any regular Work Plan and run manually or scheduled. I imagine the UI would look like the current Work Plan editor, only have Work Plans in its list instead of Areas/Sidewalks/Deadends. The Meta Work Plan would automatically pick up on changes made to the Work Plans it contains. Use Case: As a Yarbo…

Shot down in spectacular fashion! Yet it’s kinda along the lines of thought here…kinda?

I am realizing I’m manually doing “Mowing Days” (or Work Plans of Work Plans or a constantly renewing queue) where I MANUALLY select and mow a few Work Plans per day, and it’s turning into a regular rotation. I would like to SCHEDULE these “Mowing Days” and be able to postpone one for rain or something, pushing everything out a day.

I don’t mow the “Front Left + Front Right” on Monday, I do it on Mowing Day A, which was scheduled for today, but it’s raining, so it’ll push to tomorrow. “B” will push to Monday. And so on.

Friskies Buffet Mowing. (If you get THAT reference, you are way too old.)

---

_[View the full topic](https://forum.yarbo.com/t/add-queue/1552)._
