# Work plan simulation

**URL:** <https://forum.yarbo.com/t/work-plan-simulation/4635>\
**Category:** Yarbo Snowblower\
**Tags:** snowblower, lawn-mower, yarbo-app, mapping\
**Created:** [December 7, 2025, 5:18pm UTC](https://forum.yarbo.com/t/work-plan-simulation/4635 "2025-12-07T17:18:31Z")\
**Posts on this page:** 4\
**Page:** 1

<div class="post-metadata">

**Author:** ![hidekigebken](https://yyz1.discourse-cdn.com/flex007/user_avatar/forum.yarbo.com/hidekigebken/32/863_2.png) [@hidekigebken](https://forum.yarbo.com/u/hidekigebken)\
**Post date:** [December 7, 2025, 5:18pm UTC](https://forum.yarbo.com/t/work-plan-simulation/4635/1 "2025-12-07T17:18:31Z")

</div>

Does anyone know if Yarbo is developing a simulation of a workplan to visualize how yarbo is moving in the work area?

---

<div class="post-metadata">

**Author:** ![bryan.wheeler](https://yyz1.discourse-cdn.com/flex007/user_avatar/forum.yarbo.com/bryan.wheeler/32/215_2.png) [@bryan.wheeler](https://forum.yarbo.com/u/bryan.wheeler)\
**Post date:** [December 7, 2025, 5:29pm UTC](https://forum.yarbo.com/t/work-plan-simulation/4635/2 "2025-12-07T17:29:29Z")

</div>

I believe they might have something like this internally but I don’t expect they have plans to release this in the app. Curious why you feel this feature would be useful to you. You can generate a preview in the area settings to get a layout of the path lines and also when executing a work plan. You can also disable the auger in the work preferences for the snow blower and send it out on a test run (recommend setting auger height up some).

---

<div class="post-metadata">

**Author:** ![Yarbo-Forum](https://yyz1.discourse-cdn.com/flex007/user_avatar/forum.yarbo.com/yarbo-forum/32/126_2.png) [@Yarbo-Forum](https://forum.yarbo.com/u/Yarbo-Forum)\
**Post date:** [December 9, 2025, 9:15am UTC](https://forum.yarbo.com/t/work-plan-simulation/4635/3 "2025-12-09T09:15:40Z")

</div>

At the moment, we don’t have plans to develop a workplan simulation feature.

---

<div class="post-metadata">

**Author:** ![hidekigebken](https://yyz1.discourse-cdn.com/flex007/user_avatar/forum.yarbo.com/hidekigebken/32/863_2.png) [@hidekigebken](https://forum.yarbo.com/u/hidekigebken)\
**Post date:** [December 11, 2025, 5:51am UTC](https://forum.yarbo.com/t/work-plan-simulation/4635/4 "2025-12-11T05:51:45Z")

</div>

I’m from a manufacturing environment where everything is simulated before it is being used on the shop floor to predict the outcomes and select the best desired results. In this case, a dry run could take an hour or so depending on the area to clean. However a simulated path would only take minutes. Moreover, changing the snow deposit location would create a different travel paths, which when simulated on the app might create a better solution in terms of visual appearance after snow blowing (i.e perfect lines instead of criss-cross and turns all over the place).
