I am new to the Yarbo family and I have solved a couple of issues with your help. Here’s another:
I have several work areas for Yarbie to manage and one requires a path to connect it to another zone. I think I’m doing it right:
Yarbie’s house is near the bottom of the screen and the distant work zone is near the Edit Map button at the top. The work gets completed but I noticed that he likes to scrape a lot closer to the ground than programmed. I have the initial work zone, the path, and the distant work zone set to 1.40”. I think it respects that on the way out. But the return had it much closer to the ground (think Gillette razor close)
I hope you can see the difference. I include a screen cap of the zone settings:
Yarbie returned to the home base by driving into the zone right beside his house and then made a bee line to the path that he uses to go to the front yard. I suspect that is his default route. But that path also has a 1.40” setting.
Something is confusing Yarbie and he’s dropping his chin. Any ideas?



