Sequential job rotation

I think something like this has been brought up before, but I’m going to bring it up again.

We need another option for scheduling other than just by day of the week. I’ve been using my Yarbo pretty regularly for about a month and a half now, and between weather, unexpected errors, and random stops, ol’ HAL 9000 is afraid it can’t do my entire yard in a single week. To be clear, I’m also not letting it mow at night. I live in the country and rather like my local firefly population. :wink: That said, from 7AM to 8PM seems to me to be a pretty good daily run considering if it CAN run all day with out errors, and recharging twice. But even with that, the two plans that cover the large majority of the yard easily take 2.5-3.5 days to complete, and there are two more areas to complete beyond those that each take a minimum of a day.

It would be VERY handy to be able to create a simple list of plans to execute in a set order, set the allowable operation time (just like the current schedule), and have it just execute it in a loop. It also would be nice to be able to add pause/delay steps between plans or at the end of the loop if you want the Yarbo to wait for the next day(s) to restart the loop or the next plan.

Thanks for sharing your suggestion. I’ll continue to monitor feedback from the community on this topic and pass it along to the team for consideration.

Just to make a clarification to what I wrote above. The two plans that make up the majority of my yard take over two days worth of time for each plan.

I realize now that the way I worded it, sounded like the two plans together came out to that much time.

Effectively, to run all the plans and my entire yard takes like 8-9 days depending on starting and stopping. And technically two of the plans only need to be run every other time so doing a loop of 1-2-3-4-1-2 would be really good.