This request is huge. Where I am at, it can get well into the 100’s and I would like to have the rover only cut during certain hours. What makes this challenging for me is the times would vary based on the module.

EX:

  • Mower is quiet. It could cut from 6am until 11am. Then resume around 7pm to 9pm.
  • Blower not quiet. I would restrict this to 8am to 11am and resume 7pm-8pm in the hot months
  • Start a plan, pause the plan and run the rover manually for some time, then tell the rover to continue the plan it did not complete.

As this product advances, I see the potential with some of these tweaks. Even if this granularity was not added immediately, a pause would be great!