Ability to create more complex job scripts with percentage start points

@Yarbo: With regard to work plans, it would be very helpful to be able to set more complicated plans where we could chain % complete orders together.

For example, when leaf blowing, the blower can get overwhelmed by the amount of leaves gathered when blowing the entire lawn. (My property is surrounded by 100’ oak and maple trees, resulting in piles of leaves everywhere.) I usually have to let it run to about 45%, when it has cleared the edge areas and sides, then stop the job and tell it to resume at 75%, to clear the back half of the lawn, then go back to 45% and clear the upper half all the way through to the finish. It would be great to be able to script this kind of job behavior.

Either this, or be able to run programs where a given area can be done two separate times in the same job: edge areas, β†’ lower lawn area (to clear half the buildup), β†’ upper lawn β†’ lower lawn (to completely clear everything.

Thanks for the consideration!

3 Likes

It’s a work around, but you can create additional work areas on top of the original work area layer.

then run them in the order you want.

2 Likes

Hi Patrick, thank you for your suggestion! We completely understand the need for more flexible work plan scheduling, especially in situations like heavy leaf buildup. At this time, we do not have plans to implement this feature, but if more users show interest, we will definitely revisit and reevaluate the priority of this request.

Thanks again for bringing this up β€” we really appreciate your feedback!