I suspect you’d have to pick the active dock before starting the Workplan. But let’s see what @bryan.wheeler has to say.
Help me Obi One @bryan.wheeler your my only hope???
You would have to activate the second docking station before starting the plan for it to use that docking station.
So if I activate the other dock, schedule the work plan in that area will it follow the path I created from the dock it is currently on to the other area and start working, then return to the second dock set up in that area?
I haven’t tried that, but I suspect it would work that way. I don’t see any reason why it wouldn’t. You can manually drive up to any dock and manually start charging. As long as it has a pathway off the dock, in theory it should have a way to calculate a path to the area of work.